Wood Door Installation: Sequence and Fixings

2024 · HIHAUS

Wood Door Installation: Sequence and Fixings

A timber door set is installed in a fixed order: assemble and fix the frame, hang the leaf, fit the lock and stop, then apply the architrave. Doing the architrave early is the most common error, because it covers the fixings you still need to reach and it gets damaged while the leaf is being hung.

Steps

The three checks that prevent callbacks

First, the swing test: open the leaf to 90 degrees and let it go. It should not swing on its own; if it does, the frame is out of plumb. Second, the latch test: the latch should engage the strike with light pressure and without lifting the leaf. Third, the gap test: the gap at the head and both stiles should be consistent, within a millimeter or two, because an uneven gap will show at the architrave line.

Finishing and movement

Timber moves with humidity, and an interior door in a new building will move most in its first heating season. Seal all six faces of the leaf, including the top and bottom edges, before hanging, and leave a small expansion allowance at the lock side rather than fitting the leaf tight. A door fitted tight in a dry season will bind in a wet one.

If you are ordering timber doors for a project, we can supply them pre-hung with the frame and hardware prepared, which removes most of the site fitting and the associated callbacks.

Need this checked against your project?

Send us your drawings or the code requirement — our engineers reply within 12 hours.

Start your project

Custom systems, engineered to your drawings.

Response within 12 hours. Your info stays private.

Call WhatsApp Get a Quote